E-Government Services

                    E&P Factsite

The PAU Factsite contains information on licensing activity, drilled wells, Geological and Geophysical surveys and other related petroleum Exploration and Production (E&P) information. The information is regularly synchronized with data contained in the Crane E&P database, the repository for all E&P data.

Visit Site

Resources

Twitter Feed
@PAU_Uganda

- 5 hours ago

@CEOEastAfrica: #ICYMI The State of Uganda’s oil and gas Sector. The Government of Uganda and Total on 11th September 2020, initialed the Uganda Host Government Agreement (HGA) for the East Africa crude oil pipeline (EACOP) project. https://t.co/f6Xb5RZQrh @PAU_Uganda @GovUganda @Total
h J R
@PAU_Uganda

- 5 hours ago

Kenya undertook a pilot scheme whereby crude oil produced during testing (before full field development) was transported by trucks to Mombasa for export. The pilot project was, however, suspended in June 2020 due to various challenges, including the unsuitable road network.
h J R
@PAU_Uganda

- 5 hours ago

The trucks which have been seen moving to and from the Albertine Graben transport equipment, fuel and other materials used during the drilling operations, while others transport waste generated to the respective treatment plants for safe disposal.
h J R
@PAU_Uganda

- 5 hours ago

Government through @UNOC_UG has advertised for the sale of this test crude oil several times. Once the buyer is identified the test crude oil will be processed and stabilised in order to be transported to the buyer’s premises. It can be potentially used for power generation.
h J R
@PAU_Uganda

- 5 hours ago

The test crude oil is containerized, and to date, 45,000 barrels of crude oil produced during well testing operations during the exploration phase in the is stored on site at different locations (Kasemene 1, Kigogole and Ngiri in Buliisa and at Tangi Camp in Nwoya district).
h J R